Facility layout and location: an analytical approach
Furkejuvvon:
| Váldodahkkit: | , |
|---|---|
| Materiálatiipa: | Girji |
| Giella: | eaŋgalasgiella |
| Almmustuhtton: |
Englewood Cliffs
Prentice-Hall
1974
|
| Ráidu: | Prentice-Hall International Series in Idustrial and Systems Engineering
|
| Fáttát: | |
| Fáddágilkorat: |
Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
MARC
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | UCU7121 | ||
| 003 | CL-VaPUC | ||
| 008 | 960628e19740000us |||||||||||||||||eng|d | ||
| 020 | |a 0132991497 | ||
| 082 | 0 | 4 | |a 658.23 |b FRA |2 21 |
| 100 | 0 | |a Francis, Richard L |e author |9 365661 | |
| 700 | 0 | |a White, John A |e author |9 365662 | |
| 245 | 1 | 0 | |a Facility layout and location: an analytical approach |
| 300 | |a 468 p | ||
| 942 | |c BK | ||
| 945 | |d 19960628 00:00:00 |a lriquelm | ||
| 260 | |a Englewood Cliffs |b Prentice-Hall |c 1974 | ||
| 650 | 0 | |a Equipo industrial |9 263607 | |
| 650 | 0 | |a Plantas industriales |9 364524 | |
| 650 | 7 | |a GESTION DE LOS BIENES DE EQUIPO |2 CL-VaPUC |9 365623 | |
| 650 | 0 | |a Producción |9 263680 | |
| 650 | 0 | |a Administración |9 259325 | |
| 583 | |a last modification |c 20150428 10:44:33 |k Rodrigo Vera | ||
| 490 | 0 | |a Prentice-Hall International Series in Idustrial and Systems Engineering | |
| 999 | |c 249816 |d 249814 | ||
| 952 | |0 0 |1 0 |4 0 |6 658_230000000000000_FRA_1974 |7 0 |8 A |9 267351 |a BIBING |b BIBING |d 2019-11-19 |i 4176022 |o 658.23 FRA 1974 |p 4176022 |r 2025-01-20 |w 2019-11-19 |y BK |k EII | ||